Description
Construction has been going on for the last couple weeks at the left edge of the southbound lanes at the northern end of Rutherford Avenue. As it currently stands, this is too narrow for two lanes of cars plus bikes. Please use cones to squeeze it to one vehicle lane plus a bike lane for that stretch.
Attached image is a photo taken today (10/17), from when I happened to be passing through. The truck has a car to its left, preventing it from moving left, and the trailer passes the bike with inches (or less) of clearance.
11 Comments
Acknowledged Boston Open311 (Verified Official)
Boston Open311 (Verified Official)
Boston Open311 (Verified Official)
Boston Open311 (Verified Official)
Boston Open311 (Verified Official)
Boston Open311 (Verified Official)
Boston Open311 (Verified Official)
Boston Open311 (Verified Official)
Boston Open311 (Verified Official)
Boston Open311 (Verified Official)
Closed Boston Open311 (Verified Official)